Cost of Abandoned, Contaminated Mine Sites in B.C. $508 Million, Up 83 Per Cent Since 2014

Costs associated with the closure and reclamation of 84 abandoned industrial sites, mostly from mining, in B.C. have increased to $508 million, according to new information released from the Crown Contaminated Sites Program.

Responsibility for the sites has fallen to the province because the owners or operators of the projects “no longer exist,” according to a provincial press release

The estimated cleanup costs have grown by $231 million since 2014, representing an increase of 83.4 per cent, watchdog group MiningWatch notes

According to the province, a number of the mines, like the Britannia Mine near Squamish, or the Bralorne-Takla Mine in northern B.C., that now present a risk to human and enviornmental health, operated before 1969 when modern environmental legislation was created.

Although the province is quick to highlight work done over the past two years to clean up contaminated sites, Ugo Lapointe from MiningWatch says the significant growth in overall liability signals an urgent need for reform in the mining sector.

Progressive Bloggers // Blogues progressistes