The electricity created by the controversial Site C dam — long touted for producing enough electricity for 450,000 homes — could end up powering natural gas fracking operations in northeast B.C.
The Prince George Citizen reported on Wednesday that for the first time BC Hydro is considering Site C as a power source for its proposed Peace Region Electrical Supply project, a major transmission line project in northeast B.C.
If the Site C dam gets built (it’s currently facing several legal challenges) and BC Hydro moves forward with the proposed route for the transmission line, natural gas (Read more…)
