
The Site C dam, advanced as the province’s showcase clean energy project by the B.C. government, will cause significant environmental damage without any significant climate benefit, according to a new report from the University of British Columbia.
Authored by Rick Hendriks from Camerado Energy Consulting, the report found Site C, a BC Hydro megadam proposed for the Peace River near Fort St. John’s, will not provide energy at a lower greenhouse gas (GHG) emission rate than other alternative energy projects.
“The government stated that the unprecedented level of significant adverse environmental effects from Site C are justifiable, in part, because the project delivers energy and capacity at lower GHG emissions than the available alternatives,” Hendriks, an energy consultant with more than 20 years experience analyzing large-scale hydropower projects, said.
“Our analysis indicates this is not the case.”
Comparing BC Hydro’s own data on Site C and alternative energy scenarios, the report found the megadam provides no substantial benefit over other renewable sources like wind and solar.
